Thursday, January 30, 2014

Jan 29th Assignment

Been working on the whole room, its rather large but I like where its going. I've gotten the most of the first floor done. But since I'm building something very large its taking time to build, as well as my own limitations with the program are slowing me down. But for the most part I'm getting the hang of it. Here's what I got done.
 The one above shows the main walk way that leads to the facility
 the second picture shows the main entrance that leads in the facility as well as the curved windows
the last shows the whole facility you can almost see the top of the hanger bay that I'm building, the large cylinder in the middle is the main lift that leads to the surface from the mines basically a giant elevator.  

No comments:

Post a Comment